Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | China |
---|---|
Brand Name: | YYG |
Certification: | CE, ISO |
Minimum Order Quantity: | 1 |
Price: | Negotiable |
Packaging Details: | Export Wooden Cases or pallets |
Delivery Time: | 7-10 Workdays |
Payment Terms: | L/C, T/T |
Material: | 20CrMo/40Cr | Type: | Side Type/ Top Type/ Box Type |
---|---|---|---|
OEM: | OEM Service Available | Warranty: | 12 Months |
High Light: | 20CrMo Stone Breaking Hammer,125mm Stone Breaking Hammer |
Chisel 125mm Rock Breaker Excavator Stone Breaking Hammer / Hydraulic Breaker Machinery
Description
1. High Strength and wear resistance steel plate adopted for main parts.
2. Compatible with various brands of excavator and backhoe loader.
3. Well heat treatment for through bolt and cylinder, protecting hydraulic breaker from fracture damage.
4. Unique valve system. JISAN hydraulic breakers adopt simple hydraulic circuit system, which reduce oil consumption and improve working efficiency.
5. First-class quality. Introduce processing equipments and main body producer technician from Korean to guarantee the quality.
6. Powerful stroke. Compared with other brand's products, JISAN breaker has more powerful stroke and reliable performance.
Description | Unit | SB10 | SB20 | SB30 | SB35 | SB40 | SB43 |
Applicable Carrier | ton | 0.8~2.5 | 1.2~3.0 | 2.5~4.5 | 3.0~5.5 | 4.0~7.0 | 6~9 |
Overall Weight | lb | 154 | 198 | 265 | 397 | 551 | 838 |
kg | 70 | 90 | 120 | 180 | 250 | 380 | |
Overall Length | in | 38.3 | 42.2 | 45.2 | 48.8 | 53.1 | 63.7 |
mm | 972 | 1071 | 1147 | 1239 | 1349 | 1618 | |
Required Oil Flow | gal/min | 4~8 | 5.3~10.6 | 6.6~13.2 | 7.9~16 | 10.6~18.5 | 13.2~23.8 |
ℓ/min | 15~30 | 20~40 | 25~50 | 30~60 | 40~70 | 50~90 | |
Operating Pressure | psi | 1,280~1,707 | 1,280~1,707 | 1,280~1,707 | 1,422~1,849 | 1,565~1,991 | 1,707~2,134 |
㎏/㎠ | 90~120 | 90~120 | 90~120 | 100~130 | 110~140 | 120~150 | |
Impact Rate | bpm | 800~1400 | 700~1200 | 600~1100 | 500~1000 | 500~900 | 400~800 |
Hose Diameter | in | 3/8,1/2 | 3/8,1/2 | 1/2 | 1/2 | 1/2 | 1/2 |
Tool Diameter | in | 1.6 | 1.8 | 2.1 | 2.4 | 2.7 | 3 |
mm | 40 | 45 | 53 | 60 | 68 | 75 |
Description | Unit | SB45 | SB50 | SB57 | SB60 | SB70 |
Applicable Carrier | lbs | 15,500-31,000 | 24,500~36,000 | 24,500~36,000 | 33,000~40,000 | 40,000~46,000 |
ton | 7~14 | 11~16 | 12~16 | 15~18 | 16~21 | |
Overall Weight | lb | 1124 | 1687 | 1828 | 2767 | 3223 |
kg | 510 | 765 | 829 | 1255 | 1462 | |
Overall Length | in | 71.9 | 76.1 | 78 | 86.4 | 90.4 |
mm | 1827 | 1934 | 1983 | 2195 | 2295 | |
Required Oil Flow | gal/min | 15.9~26.4 | 21.1~29.1 | 21.1~29.1 | 23.8~31.7 | 26.4~39.6 |
ℓ/min | 60~100 | 80~110 | 80~110 | 90~120 | 100~150 | |
Operating Pressure | psi | 1,849~2,276 | 2,134~2,418 | 2,134~2,418 | 2134~2418 | 2276~2560 |
㎏/㎠ | 130~160 | 150~170 | 150~170 | 150~170 | 150~170 | |
Impact Rate | bpm | 400~800 | 350~700 | 400~750 | 350~650 | 350~650 |
Hose Diameter | inch | 3/4 | 3/4 | 3/4 | 1 | 1 |
Tool Diameter | in | 3.3 | 3.9 | 3.9 | 4.9 | 4.9 |
mm | 85 | 100 | 100 | 125 | 125 |
Application
1. Mining: Mountains, mining, crushing, secondary crushing
2. Metallurgy, slag cleaning, ladle furnace demolition, demolition equipment foundation body dissatisfied
3. Railway, tunnel, bridge, mountain down.
4. Highway: highway repair, cement pavement broken, foundation excavation.
5. Municipal gardens, concrete crushing, gas engineering construction, the transformation of the old city.
6. Building: the old building demolition, reinforced concrete broken.
Package
1. The standard free spare parts delivered with hydraulic breaker including: two pieces of Chisel, two pieces of high pressure oil hoses, a set of nitrogen charging device includes a gas bottle and a pressure gauge , a set of repair tools contained in tool box.
2. Inner is stretch film, outside is export wooden case or as customer’s request
Delivery
1. Delivery time: Usually 3-7days (1-5sets) after down payment.
2. We can arrange ocean or air transportation according to your request from any port of China.